Commissioning is an essential step to ensure the proper functioning, safety, and longevity of your hot tub. Carried out according to the rules of the trade, it allows for the validation of the installation, optimization of settings, and the best conditions for starting to use your equipment.
At PROVENCESPA, each commissioning is carried out according to a rigorous procedure, adapted to the type of hot tub concerned. It allows for the verification of all technical, hydraulic, and electrical elements, while providing you with the necessary basics for simple, efficient, and long-lasting daily use.
👉 Commissioning service prices are detailed within each hot tub range.
Commissioning – Aqualife, Premium and Built-In Hot Tubs
This service includes:
– Complete hot tub check before filling.
– Connection of the hot tub to the dedicated electrical line provided by you (mandatory conformity of the electrical panel).
– Connection of the drain to the main sewer if necessary, with an external valve to the hot tub (on quote, to be validated before ordering).
– Filling the hot tub and complete startup of the installation.
– Initial parameter setting and verification of all functions.
– Presentation of the control panel and essential features.
– Practical advice for maintenance and water treatment.
Commissioning – Exclusive Range
Commissioning of the Exclusive range requires specific intervention due to the on-site cladding. This service requires the presence of two technicians, to ensure a meticulous installation and impeccable finishes.
This service includes:
– Complete hot tub check before commissioning.
– On-site cladding by two technicians.
– Connection of the hot tub to the dedicated electrical line (mandatory conformity of the electrical panel).
– Connection of the drain to the main sewer if necessary, with an external valve to the hot tub (on quote, to be validated before ordering).
– Filling and complete startup of the hot tub.
– Parameter setting and verification of essential settings.
– Presentation of the control panel and features.
– Advice on use and maintenance.
Commissioning – Swim Spa
This service includes:
– Complete swim spa check before commissioning.
– Connection to the dedicated electrical line (mandatory conformity of the electrical panel).
– Connection of the drain to the main sewer if necessary, with an external valve to the hot tub (on quote, to be validated before ordering).
– Filling and commissioning of the swim spa (intervention may be carried out in several stages due to water volume).
– Parameter setting and verification of specific functions.
– Presentation of the control panel and settings.
– Advice for maintenance and water treatment.
Commissioning – Professional, Stainless Steel and Mosaic Hot Tubs
The commissioning of professional hot tubs, as well as Stainless Steel or Mosaic models, requires an in-depth study and tailored intervention. Due to the complexity of installations (technical room, advanced hydraulics, automated treatment, integration constraints), each project is handled in a personalized manner to ensure an optimal result.
This service includes:
– Prior technical analysis of the installation.
– Coordination with the various site stakeholders if necessary.
– Complete check of equipment (hydraulics, filtration, treatment, safety).
– Specific connections adapted to the project configuration.
– Filling and complete commissioning of the installation.
– Parameter setting of management and treatment systems.
– Training on use and maintenance protocols.
⚠️ This service is provided only on quote, depending on the technical characteristics and constraints specific to each installation.